We are on the job day and night, 24/7, keeping our roads as clear and safe as possible. Road clearing and salting are done according to the following schedule.
| Road type | Plowing goal |
| 100-Series and trunk highways, and other high traffic roads | Salted to achieve bare pavement within 8 hours after snow stops |
| Secondary routes and other medium volume roads | Salted to achieve centre strip bare up to 5 metres within 12 hours after snow stops |
| Local paved roads, most subdivisions and residential streets | Salted to achieve centre strip bare up to 2.5 metres within 24 hours after snow stops |
| Gravel roads | Sanding as needed |