| Summary Offence Tickets Regulations |
|
Schedule 28 Electrical Installation and Inspection Act |
||
|
Offence |
Section |
Out of Court Settlement |
1. |
Making non-conforming electrical installation |
7(1) |
$452.00 |
2. |
Failing to notify inspector or public utility (specify) prior to commencing alteration |
10(1) |
$452.00 |
3. |
Connecting alteration or addition (specify) prior to inspection |
10(2) |
$912.00 |
4. |
Connecting non-conforming alteration or addition (specify) |
10(3) |
$912.00 |
5. |
Obstructing inspector or public utility (specify) |
13 |
$912.00 |
6. |
Making installation, alteration or addition (specify) inaccessible for inspection |
14 |
$452.00 |
Schedule 28 added: O.I.C. 2004-204, N.S. Reg. 153/2004; amended: O.I.C. 2007-183, N.S. Reg. 201/2007.