Mining Industry Expenditures

Investment by the mining industry in Nova Scotia is monitored by means of annual surveys of all companies having operations or activity in the province. Aggregate producers are not included in this survey. The surveys are carried out by the Nova Scotia Department of Natural Resources (DNR) jointly with Natural Resources Canada (Minerals and Metals Sector - Minerals and Mining Statistics Division), and Statistics Canada (Investment and Capital Stock Division). The Mines and Energy Development Division of DNR actively participates in the Annual Survey of Canadian Mineral Exploration Expenditures and the Annual Survey on Exploration Development, Capital and Repair Expenditures.

Preliminary figures indicate exploration expenditures in 1998 were down moderately from 1997 (Table 1.1), as was diamond-drilling. Capital expenditures at existing mines were down moderately in 1998 from 1997 while repair and maintenance expenditures were up moderately.

Blue Line

Table 1.1. Mining industry expenditures in 1997 and 1998.
  1997 19981
Mineral Exploration Expenditures (field plus overhead)2 $6,726,000 $4,835,000
Exploration diamond drilling2
Exploration drilling - other2
26 487 m
1 440 m
20 964 m
879 m
Mineral Development Expenditures (field plus overhead) $5,483,000 $2,713,000
Capital and Repair Expenditures at Mining establishments
Capital Expenditures
Repair and Maintenance Expenditures
$33,927,505
$25,048,754
$27,604,870
$35,415,668
1Preliminary
2Includes deposit appraisal

Blue Line

Back to Top

Mining Leases

There was one Mining Lease during the year. In November, Lynx Minerals Inc. was issued a Mining Lease for claims held over the Scotsville barite deposit in Inverness County. A Mining Lease renewal was also issued in September to Shaw Group Limited for silica at Nine Mile River, Hants County.

Blue Line

Back to Top

Mining Permits

The department issued one Mining Permit during the year. Tangier Limited Partnership was issued a Mining Permit to permit the extraction of gold and associated minerals at Tangier, Halifax County.

Blue Line

Back to Top

Production Information from Mines, Quarries and Other Operations

In 1998, the estimated total value of Nova Scotia's mineral production, including secondary mineral processing and crude petroleum, totalled $473 million (Fig. 1.1), a decrease of 10% from the year before. Excluding petroleum, the total value of Nova Scotia's mineral production totalled $352 million, down 14% from 1997's figure of $407 million. This decrease was due largely to lower outputs of salt, coal and construction aggregates. Employment in Nova Scotia's mineral industry totalled roughly 3700 persons (Fig. 1.2), a 3% decrease from the year before (Fig. 1.3) .

Blue Line

Figure (Not presently available)

Figure 1.1. Value of mineral production by commodity group.

Blue Line

Figure (Not presently available)

Figure 1.2. Employment by mineral commodity group.

Blue Line

Figure (Not presently available)

Figure 1.3. Historical trend of the value of mineral production in Nova Scotia, 1985-1998.

Blue Line

Coal sales dropped by approximately 22% in 1998 to 2.1 million tonnes from 1997's figure of 2.7 million tonnes as production problems continued to plague the province's largest coal mine, the Cape Breton Development Corporation's Phalen Colliery. A number of major roof falls during the year resulted in significant work stoppage and layoffs, and forced their primary customer, Nova Scotia Power Inc., to again import coal from the United States.

There were mixed results for Nova Scotia's industrial mineral producers in 1998. Although down slightly from the year before, 1998 was another good year for Nova Scotia gypsum shipments with a total of 6.8 million tonnes shipped, mainly to wallboard plants along the U.S. Eastern Seaboard. Nova Scotia is Canada's largest gypsum producer, accounting for more than 80% of the country's total production. More than 70% of the total gypsum imports into the U.S. came from Nova Scotia in 1998.

Demand for Nova Scotia salt declined by 28% in 1998 from 1997 primarily due to the re-activation in the fall of 1997 of Seleine Mines Inc.'s salt mine located on the Magdalen Islands. Seleine was forced to suspend operations there due to severe flooding in 1995. Both the Seleine mine and Nova Scotia's Canadian Salt Company Limited mine are owned by the same parent company.

Cement sales were up 11% from 1997. Overall, aggregate production (crushed stone, sand and gravel) decreased by 11% in 1998 from the year before. Crushed stone production declined by 7% while sand and gravel production dropped by 20%. Peat moss production rose 33% in 1998 over 1997 as a new producer, MacDonald Peat Moss Limited, commenced production on a bog located near Kennetcook, Hants County. Clay products production was up 5% over 1997.

Although petroleum is included in the overall value of Nova Scotia's mineral production, this appendix focuses on the nonpetroleum sectors of the industry (Table 1.2), providing a description of each mine site. Table 1.3, Table 1.4, Table 1.5 and Table 1.6 provide more detailed information on production of different commodities. Site locations are shown on the accompanying maps, Figure 1.4 and Figure 1.5.

Blue Line

Table 1.2. Summary of Nova Scotia mineral production, 1997 and 1998.
  1997 1998
Description Value '000$1 Employment* Value '000$1 Employment*
Metals
Gold 02   21  
Total metals 02   21 35
Industrial Minerals
(Non-Metals)
Anhydrite 2,148   1,733  
Barite **731   **751  
Gypsum3 72,655   71,703  
Limestone4 and Dolomite 4,776   2,824
Peat **1,491   **1,713  
Salt **68,680   **51,241  
Silica **2,600   **2,400  
Total Non-Metals 153,081 867 132,365 872
(Structural Materials)
Dimension Stone 303   305  
Cement **32,260   **35,065  
Clay Products **5,000   **5,600  
Crushed Stone 43,575   40,445  
Sand & Gravel 14,032   11,164  
Total Structural Materials 95,170 700 92,579 654
Total Industrial Minerals 248,251 1,570 224,944 1,526
Fuels
Coal 158,949 1,868 127,142 1,790
Petroleum - Crude 117,450 340 120,830 340
Total Fuels 276,399 2,208 247,970 2,130
Total Mineral Production 524,560 3,800 472,935 3,690
Change from Previous Year -16% -5% -10% -3%
1Estimated from Department of Natural Resources sources
2There were no metal mines operating in 1997
3Does not include the value of gypsum quarried for plaster products
4Does not include the value of limestone quarried for cement production
*Average number of persons during production period
**Processed or manufactured value
Note: Production represents shipments; numbers may not add to totals due to rounding

Blue Line

Table 1.3. Coal production for the calendar year 1998.
  Production  
Company Mine Name Location Tons Tonnes Total Number Employed1 Approx. $Value2
Underground Mining
Cape Breton Development Corp. (CBDC) Prince Mine Point Aconi, Cape Breton County        
Phalen Mine Lingan, Cape Breton County        
Total (underground) 1,888,099 1 712 872 1,658  
Open Pit Mining
Brogan Mining Company Limited Sullivan Creek and Toronto Rd. Mines Sullivan Creek, Cape Breton County 48,232 43 756 20  
Cape Crushing Company Limited Merritt Point Mine North Sydney, Cape Breton County 2,646 2 400 2  
Evans Coal Mines Limited St. Rose Mine St. Rose, Inverness County 106,134 96 284 32  
Pioneer Coal Limited Stellarton Mine Stellarton, Pictou County 243,157 220 591 58  
Thorburn Mining Limited Thorburn Mine Thorburn, Pictou County 56,118 50 910 23  
Total (open pit) 456,287 413 941 135  
Total for all Coal Producers 2,344,372 2 126 800 1,790 127,142,000
1Personnel employed in clerical, supervisory, etc. positions as well as mining personnel
2Estimated from Nova Scotia Department of Natural Resources sources
Note: Production represents shipments; numbers may not add to totals due to rounding

Blue Line

Table 1.4. Industrial minerals production for the calendar year 1998.
Company Location Production
Total Number Employed1

Approximate $Value2
Tons Tonnes
Gypsum
Fundy Gypsum Company Miller Creek and Wentworth Road, Hants County 1,839,417 1 668 708 166  
Georgia-Pacific Canada, Inc. Sugar Camp, Inverness County 1,343,143 1 218 491 98  
Little Narrows Gypsum Company Little Narrows, Victoria County 1,090,597 989 383 104  
National Gypsum (Canada) Limited East Milford, Halifax County 3,254,286 2 952 269 100  
Total (gypsum) 7,527,500 6 828 000 468   71,703,000
Anhydrite
Fundy Gypsum Company Miller Creek and Wentworth Road, Hants County 69,499 63 049 see gypsum  
Little Narrows Gypsum Company Little Narrows, Victoria County 84,562 76 714 see gypsum  
Total (anhydrite) 154,100 139 800   1,733,000 
Salt
The Canadian Salt Company Limited Pugwash, Cumberland County 836,351 758 733 210  
Sifto Canada Inc. Nappan, Cumberland County 97,810 88 733 73  
Total (salt) 934,166 847 470 283 51,241,0003
Limestone and Dolomite
Lafarge Canada Inc. Brookfield, Colchester County 543,434 493 000 11  
Mosher Limestone Company Limited Upper Musquodoboit, Halifax County 80,328 72 873 17  
Nova Scotia Power Incorporated Glen Morrison, Cape Breton County 98,847 89 673 14  
Ridge Brokers Limited Southside Harbour, Antigonish County 5,989 5 433 1  
Scotia Limestone Limited Kellys Cove, Victoria County 12,114 10 990 3  
Total (limestone and dolomite) 740,711 671 969 46 2,824,0004
Barite
E-Z-EM Canada Inc. Brookfield, Colchester County 659 598 16 751,5003
Total (barite) 659 598 16 751,5003
Clay
Shaw Brick (a member of the Shaw Group Limited) Lantz, Hants County; Shubenacadie, Halifax County 18,199 16 510 See clay products 05
Shale
Shaw Brick (a member of the Shaw Group Limited) Milford, Hants County; New Glasgow, Pictou County 7,800 7 076 See clay products 05
Total (clay and shale) 25,999 23 586 See clay products 05
Silica Sand
Shaw Resources (a member of the Shaw Group Limited) Nine Mile River, Hants County 61,729 56 000 6 2,400,0003
Total (silica sand) 61,729 56 000 6 2,400,0003
Dimension Stone
Heritage Memorials Ltd.2 Quarry: Nictaux, Annapolis County (granite)
Plant: Windsor, Hants County
1,854 1 682 20  
Wallace Quarries Ltd. Quarry: Wallace, (Sandstone)
Cumberland County
448 406 5  
Total (dimension stone) 2,302 2 088 25 305,000
Peat Moss
Annapolis Valley Peat Moss Company2 Berwick, Kings County 4,507 4 089 20  
Clare Organic Products Ltd.2 Meteghan Station, Digby County 3,900 3 538 15  
McDonald Peat Moss Limited2 Kennetcook, Hants County 1,752 1 589 18  
Total (peat moss) 8,407 9 216 53 1,712,5003
Aggregates
Crushed Stone Various 8,916,505 8 089 000 354 40,445,000
Sand and Gravel Various 3,076,500 2 791 000 153 11,164,000
Total (aggregates) 11,993,000 10 880 000 507 51,609,000
Total for Industrial Minerals6 21,449,000 19 458 000 1,400 184,279,000
1Total employees: mining, production, clerical, supervisory, etc.
2Estimate from Nova Scotia Department of Natural Resources sources
3Processed or manufactured value
4Does not include the value of Lafarge Canada Inc. production which value is transferred to the higher manufactured value (cement)
5Value assigned to the higher manufactured valuation (bricks)
6Excluding secondary mineral manufacturing
Note: production represents shipments; numbers may not add to totals due to rounding

Blue Line

Table 1.5. Secondary mineral manufacturing for the calendar year 1998.
Company Location Production
Total Number Employed1

Approximate $Value2
Tons Tonnes
Clay Products
Shaw Brick (a member of the Shaw Group Limited) Lantz, Hants County 26,000 23 587 45 5,600,000
Portland Cement
Lafarge Canada Inc. Brookfield, Colchester County 324,076 294 000 77 35,065,000
Total for Secondary Mineral Manufacturing 122 40,665,000
1Total number of employees including office, clerical, supervisory, mining and production
2Estimated from Nova Scotia Department of Natural Resources sources
Note: Production represents shipments; numbers may not add to totals due to rounding

Blue Line

Table 1.6. Metallic mineral production for the calendar year 1998.
Company Location Production Total Number Employed1 Approximate $Value2
Gold
Tangier Limited Partnership1 Tangier, Halifax County 49 troy ozs.   1524 g 35 21,400
Total for Metallic Mineral Production 35 21,400
1Operated for part of year only.
2Total number of employees including office, clerical, supervisory, mining and production.
3Value based on average annual metal price times weight. Also includes value of approximately 2 troy ozs. of bi-product silver.
Note: Production represents shipments; sum of components may not add to totals due to rounding.

Blue Line

Figure (Not presently available)

Figure 1.4. Location of coal mines in Nova Scotia.

Blue Line

Figure (Not presently available)

Figure 1.5. Location of industrial mineral and gold operations in Nova Scotia, 1998.

Anhydrite
1. Fundy Gypsum Co.
2. Little Narrows Gypsum Co.
Barite
3. E-Z-EM Canada Inc.

Clay and Shale
4-7. Shaw Brick, a member of the Shaw Group Limited
Gypsum
8-9. Fundy Gypsum Co
10. National Gypsum (Canada) Ltd.
11. Georgia-Pacific Corp.
12-13. Little Narrows Gypsum Co. Ltd.
14. Tusket Mining Incorporated
Limestone and Dolomite
15. Lafarge Canada Inc.
16. Nova Scotia Power, Inc.
17. Mosher Limestone Co. Ltd.
18. Ridge Brokers Ltd.
19. Scotia Limestone Ltd.
20. Shaw Resources, a member of the Shaw Group Limited
Salt
21. Sifto Canada Inc.
22. The Canadian Salt Co. Ltd.
Silica Sand
23. Shaw Resources, a member of the Shaw Group Limited
Dimension Stone
24. Heritage Memorials Ltd.
25. Lange Natural Rock and Stone Supplies
26. Scotia Slate Products Ltd.
27. Wallace Quarries Ltd.
Peat Moss
28. Annapolis Valley Peat Moss Co.
29. Clare Organic Products Limited
30. MacDonald Peat Moss Limited
Gold
31. Tangier Limited Partnership

Blue Line

Back to Top

Metal Mines and Gold Mines

Metal Mines

There were no producing metal mines in 1998.

Gold Mines

Tangier Limited Partnership

Manager: Peter Atkinson, General Manager
Address: P. O. Box 8, Tangier, Nova Scotia B0J 3H0
Production: 49 troy oz. (1524 g)
Employees: 35

In 1998, Tangier Limited Partnership re-activated underground mining operations at the Tangier site. During the months of November and December, 309 tonnes of ore were mined from the Whin vein.

Blue Line

Back to Top

Coal Mining Operations

During 1998, there were two underground coal mines and six surface coal mines operating in the province. Table 1.3 summarizes production information for the coal mines. The summaries below give brief details of the underground and surface coal mines operating in Nova Scotia.

Underground Coal Mines

Cape Breton Development Corporation

Manager(s): B. MacDonald, General Manager, Phalen Colliery
T. Isaacs, General Manager, Prince Colliery
Address: P. O. Box 2500, Sydney, N. S. B1P 6K9

Raw Coal
Production: 1,942,963 tons (1 762 645 tonnes)
Employees: 1,658

The Cape Breton Development Corporation is a federal Crown Corporation that operated two underground coal mines in Cape Breton County during 1998.

Phalen Colliery

Raw Coal
Production: 1,089,520 tons (988 406 tonnes)

The Phalen Colliery, near New Waterford, Cape Breton County, commenced production in 1987 in the Phalen Seam. The coal is extracted by the mechanical retreat longwall method. During the year, coal was mined from the No. 3 Centre and No. 8 East longwall panels. A roof fall occurred on the main gate of 8 East wall in September 1998, haulting production for six weeks.

Prince Mine

Raw Coal
Production: 853,444 tons (774 239 tonnes)

The Prince Mine is located in Point Aconi, Cape Breton County. The mine began underground production from the Hub Seam in 1975, initially using room and pillar methods. Mechanized retreat longwall operations began in 1980.

During 1998, coal was mined from the No. 15 West and No. 9 East longwall panels. Development work continued on the No. 1 North longwall panel.

Surface Coal Mines

Evans Coal Mines Limited

Manager: E. Fraser
Address: R. R. #1, Inverness, N. S. B0E 1N0
Production: 106,134 tons (96 284 tonnes) of coal
Employees: 32

The Evans Coal Mines Limited began surface coal mining operations at St. Rose, Inverness County, in 1993, following the closure of the underground mine in 1992. Coal is extracted from the No. 5 Seam crown pillar and from the pillars left behind by the underground operation. Mining proceeded in a southerly direction. Overburden and waste rock were removed by blasting and ripping by bulldozers. Material is loaded and hauled using hydraulic excavators and dump trucks. Extensive underground workings were encountered during the coal extraction process. During the year, the Duggan Mountain Road was reinstated to its original location upon completion of mining and reclamation in the area.

Pioneer Coal Limited

Manager: C. Chisholm
Address: P. O. Box 929, Westville, N. S. B0K 2A0
Production: 243,157 tons (220 591 tonnes) of coal
Employees: 58

Pioneer Coal began mining coal from the Foord Seam at the Stellarton mine site in March 1996, using hydraulic excavators and dump trucks. The seam was mined in both an easterly and westerly direction from the existing pit. The Foord Seam is approximately 40 feet thick. Mining becomes more selective in the western end of the mine as the percentage of ash increases. The company conducted mining operations at the site from March to June and September to December.

The coal mined from the Stellarton operation was blended on-site with coal trucked from the Evans Coal Mine and the Thorburn Mine before being shipped to the Trenton generating station.

Thorburn Mining Limited

Manager: C. Chisholm
Address: P. O. Box 929, Westville, N. S. B0K 2A0
Production: 56,118 tons (50 910 tonnes) of coal
Employees: 23

Mining at the Thorburn site began in June 1995. In 1998, the mine operated in January, February, June to October inclusive and December.

Coal was extracted from the McBean Seam crown pillar and from pillars remaining from the former underground mining operations. During the year, overburden and waste rock were removed by ripping with bulldozers. Material was loaded and hauled using hydraulic excavators and dump trucks. The seam varies in thickness from 4 to 7 feet.

Cape Crushing Company Limited

Manager: E. Brogan
Address: P. O. Box 265, North Sydney, N. S. B2A 3M3
Production: 2,646 tons (2 400 tonnes) of coal
Employees: 2

The company operates a small surface coal mine at Alder Point, Cape Breton County. Coal was mined during the year from the Upper and Lower Bonar Seams using small scale excavating equipment.

Brogan Mining Company Limited

Manager: R. Brogan
Address: 126 Main Street, North Sydney, N. S. B1V 2L6
Production: 48,232 tons (43 756 tonnes) of coal
Employees: 20

During the year, Brogan Mining Limited completed surface mining operating at the Toronto Road mine site. Coal was recovered from both the Sydney Main and Stubbert coal seams. The coal was blended with coal mined from a bulk sample extracted from the Little Pond area. Mining is carried out using bulldozers, hydraulic excavators and dump trucks. The company conducted progressive reclamation of the mined areas during the year.

The company also operated a surface coal mine at Sullivans Creek, Cape Breton County, during 1998. Coal from both operations was blended to produce a saleable product.

Black Gold Enterprises Limited

Manager: M. McCormick
Address: R. R. #1, Springhill, N. S. B0M 1X0
Production: 0
Employees: 0

There was no production at the mine in 1998.

Blue Line

Back to Top

Industrial Minerals Mining

Gypsum and Anhydrite

Georgia-Pacific Canada Incorporated

Manager: D. Duncan
Address: P. O. Box 400, Port Hawkesbury, N. S. B0E 2V0
Production: 0 tons (0 tonnes) of gypsum
Employees: 0

There was no production at the MacKay Settlement mine in 1998.

Fundy Gypsum Company

Manager: B. MacMillon
Address: P. O. Box 400, Windsor, N. S. B0N 2T0
Production: 69,499 tons (63 049 tonnes) of anhydrite
1,839,417 tons (1 668 708 tonnes) of gypsum
Employees: 166

The Fundy Gypsum Company operates quarries and crushing plants in the Wentworth Road and Miller Creek areas near Windsor, Hants County. In 1998, the company produced gypsum from its Miller Creek quarry and both gypsum and anhydrite from the Wentworth quarry. The Wentworth ore is processed in the company's heavy media plant to separate anhydrite from gypsum.

The gypsum and anhydrite are transported by unit train to shiploading facilities at Hantsport, a distance of 19 km. These products are transported to wallboard and cement plants in the United States.

Georgia-Pacific Canada Inc.

Manager: R. L. Fraser
Address: P. O. Box 400, Port Hawkesbury, N. S. B0E 2V0
Production: 1,343,143 tons (1 218 491 tonnes) of gypsum
Employees: 98

Georgia-Pacific Corporation operates a gypsum quarry at Sugar Camp, Inverness County. Overburden at the site is removed using a dragline and truck and shovels. The gypsum is drilled and blasted prior to being transported to the crusher by trucks. The crushed gypsum is then transported by truck to ship loading facilities at Point Tupper, Richmond County, a distance of 19 km.

Little Narrows Gypsum Company

Manager: Bruce Allan
Address: R. R. #1, Little Narrows, N. S. B0E 1T0
Production: 63,049 tons (76 714 tonnes) of anhydrite; 1,090,597 tons (989 383 tonnes) of gypsum
Employees: 104

Little Narrows Gypsum Company Limited operates two gypsum quarries and one anhydrite quarry near Little Narrows, Victoria County. All the gypsum and anhydrite produced is shipped from the company's dock on the Bras d'Or Lakes to destinations in Canada and the United States.

National Gypsum (Canada) Limited

Manager: Pat Mills
Address: P. O. Box 57, Milford, N. S. B0N 1Y0
Production: 3,254,286 tons (2 952 269 tonnes)
Employees: 100

National Gypsum (Canada) Limited operates the largest gypsum quarry in the province at East Milford, Halifax County. The gypsum is drilled and blasted and loaded onto trucks with hydraulic excavators and loaders. The gypsum is then transported by unit train from Milford to Wright's Cove, Dartmouth, a distance of 45 km, where it is loaded onto ships for points in Canada and the United States.

Tusket Mining Incorporated

Manager: C. E. Bain
Address: P. O. Box 48100, Bedford, N. S. B4A 3Z2
Production: 0 tons (0 tonnes)

Production in 1998 was limited to a 10 000 tonne sample at the Murchyville Mine, Halifax County. There was no product shipped in 1998.

Salt

The Canadian Salt Company Limited

Manager: A. Davidson
Address: P. O. Box 160, Pugwash, Nova Scotia B0K 1L0
Production: 836,351 tons (758 733 tonnes) of salt
Employees: 210

The Canadian Salt Company Limited mine is located at Pugwash, Cumberland County. The salt is mined by a room and pillar system of extraction, using diesel and electric drills, undercutters, loaders and trucks. Primary production during the year was from the 1000 foot level. Secondary production was from the 730 foot level and the 830 foot level.

The processing plant at the site produces industrial grades of salt, salt blocks for farm use, and refined salt for domestic consumption. Transportation is either by road, rail or from the company owned ship-loading facility at Pugwash.

SIFTO Canada Incorporated

Manager: D. Dickie
Address: P. O. Box 550, Amherst, N. S. B4H 4A1
Production: 97,810 tons (88 733 tonnes) of salt
Employees: 73

Salt has been produced from a solution salt mine at Nappan, Cumberland County, since 1947. Salt is mined by pumping water into underground wells where the salt is dissolved by the water and the resulting brine solution is then pumped back to the surface. The salt is then recovered from the brine in a processing plant, using a 'mechanical vapour recompression evaporating process' system.

During the year, salt was produced from the No. 7 and No. 8 brine wells.

Barite

E-Z-EM Canada Incorporated, Nystone Division

Manager: V. Prostak
Address: P. O. Box 69, Debert, Nova Scotia B0M 1G0
Production: 659 tons (598 tonnes) of pharmaceutical grade barite
Employees: 16

The barite deposit is located 1.6 km northeast of Brookfield, Colchester County. During 1997, the surface mine was dewatered and approximately 5,425 tons of ore were mined from the pit. All of the material that had previously been mined and stockpiled at the mine was trucked to the company's plant at Debert where it was upgraded to a pharmaceutical quality product. Refined products are then transported to the parent company, E-Z-EM Corporation, New York, USA, for further processing and packaging.

Limestone and Dolomite

Lafarge Canada Inc.

Manager: J. Cross
Address: P. O. Box 5, Brookfield, Nova Scotia B0N 1C0
Production: 543,434 tons (493 000 tonnes) of limestone
Employees: 11 (quarry) 77 (cement plant)

Lafarge Canada Inc. operates a limestone quarry at their Brookfield cement manufacturing plant, located 5 km west of Brookfield. The total production from the quarry is used to produce cement.

Mosher Limestone Company Limited

Manager: D. Mosher
Address: P. O. Box 28, Upper Musquodoboit, N. S. B0N 2M0
Production: 80,328 tons (72 873 tonnes) of limestone
Employees: 17

Mosher Limestone operates quarries near Upper Musquodoboit, Halifax County. The company produces agricultural grade dolomitic limestone in its grinding plant at Upper Musquodoboit. The product is bagged or supplied in bulk for distribution throughout the Atlantic Provinces. In 1996, the company began producing a pelletized limestone product for the domestic garden market.

Shaw Resources, A Member of the Shaw Group Limited

Manager: K. Hardie
Address: P. O. Box 60, Shubenacadie, Nova Scotia B0N 2H0
Production: 0 tons (0 tonnes) of marble

Shaw Resources produces marble intermittently from a quarry at Marble Mountain, Inverness County. This marble is used for brick manufacture and in landscaping.

Ridge Brokers Limited

Manager: A. Alward
Address: P. O. Box 59, Havelock, New Brunswick E0A 1W0
Production: 5,989 tons (5 433 tonnes) of limestone
Employees: 1

The company operates a small quarry at Southside, Antigonish Harbour, Antigonish County. No mining took place at the site in 1998. Production came from existing inventory.

Scotia Limestone Limited

Manager: D. Mosher
Address: P. O. Box 28, Upper Musquodoboit, Nova Scotia B0N 2M0
Production: 12,114 tons (10 990 tonnes) of dolomite
Employees: 3

In 1996, Mosher Limestone Company Limited purchased the assets of the Kellys Cove dolomite quarry from Scotia Limestone. The mine produced an agricultural grade dolomite for domestic sale as well as a product for the offshore steel industry. No mining took place at the site during 1998; all production came from existing inventory.

Nova Scotia Power Incorporated (Operated by Kelly Rock Limited)

Manager: D. MacKenna
Address: P. O. Box 1206, Sydney, Nova Scotia B1P 6J9
Production: 98,847 tons (89 673 tonnes) of limestone
Employees: 17

The limestone quarry at Glen Morrison, Cape Breton County, began production in 1993. The company produces several products at the on-site milling facility. In 1996, the company completed construction of a secondary and tertiary processing plant and a large limestone storage facility. During 1998, most of the production from this site was shipped to Point Aconi for use in the fluidized bed power generating station.

Clay

Shaw Brick, A Member of the Shaw Group Limited

Manager: B. Frizzell
Address: P. O. Box 2130, Lantz, Nova Scotia B0N 1R0
Production: 25,999 tons (23 586 tonnes) of clay & shale
Employees: 4

Shaw Brick mines clay from pits at Lantz, Milford and Shubenacadie, all in Hants County, and shale from quarries located in Hardwood Lands, Hants County, and New Glasgow, Pictou County. These materials are used in the company's plant in Lantz for the manufacture of bricks and other structural clay products.

Silica Sand

Shaw Resources, A Member of the Shaw Group Limited

Manager: K. Hardie
Address: P. O. Box 60, Shubenacadie, Nova Scotia B0N 2H0
Production: 61,729 tons (56 000 tonnes) of silica sand
Employees: 6

Shaw Resources produces silica sand from a deposit at West Indian Road, Hants County. This sand is processed into several silica sand products including glass grade sand.

Dimension Stone

Heritage Memorials Limited

Manager: G. Nelson
Address: P. O. Box 308, Windsor, Nova Scotia B0N 2T0
Production: 1,854 tons (1 682 tonnes) of granite (estimated)
Employees: 20

The company periodically operates a small quarry at Nictaux West, Annapolis County. The grey granite is used as dimension stone at the company's memorial manufacturing plant at Windsor, Hants County.

Wallace Quarries Limited

Manager: S. Flynn
Address: P. O. Box 203, Wallace, Nova Scotia B0K 1Y0
Production: 448 tons (406 tonnes) of building stone
Employees: 5

The Wallace Quarries, located near Wallace, Cumberland County, continued to supply building stone for major building rehabilitation work in Halifax and central Canada. Blocks of stone are sent for cutting to processing facilities in Nova Scotia, New Brunswick and Quebec to supply local markets.

Other

Two other stone operations, for which production information was not available at the time of publication, were Scotia State Products Ltd. and Lange Natural Rock and Stone Supplies. Scotia Slate operates a small slate quarry near East Gore, Hants County, while Lange operates a small granite quarry near Parkdale, Lunenburg County.

Peat Moss

Annapolis Valley Peat Moss Company Limited

President: H. Endres
Address: Berwick, Nova Scotia B0P 1E0
Production: 4,507 tons (4 089 tonnes) of peat moss (estimated)
Employees: 20 (some part time)

The company uses vacuum harvesters to recover agricultural peat from a 500 acre (200 ha) bog located near Berwick, Kings County. Baled peat products are shipped to markets in Canada, the United States and Japan.

Clare Organic Products Limited

Owner: Gerald Thimot
Address: Box 174-A, Saulnierville, Digby County, Nova Scotia B0W 2Z0
Production: 3,900 tons (3 538 tonnes) of peat moss (estimated)
Employees: 15 (some part time)

The company, which uses vacuum harvesters to recover agricultural peat from a 200 acre (81 ha) bog located near Meteghan Station, Digby County. The company has a contract to supply a major Maritime peat producer with baled peat destined for international markets.

MacDonald Peat Moss Limited

Owner: Lameque Quality Group Ltd.
Address: 86 Tourbe Street, Lameque, New Brunswick E8T 1A3
Production: 1,752 tons (1 589 tonnes) of peat moss (estimated)
Employees: 18

MacDonald Peat Moss Limited, a wholly-owned subsidiary of New Brunswick's Lameque Quality Group Ltd., has lease rights to a 1700 acre (688 ha) peat bog located on Crown land, approximately 12 km west of Kennetcook, Hants County. 1998 was the first year of production for the company, which exports baled peat to international markets.

Blue Line

Back to Top

Aggregate Resources

Approximately 11 million tonnes of construction aggregates were produced in Nova Scotia in 1998. Twenty-four companies reported crushed stone production totalling 8.1 million tonnes while 47 producers reported sand and gravel production totalling 2.8 million tonnes. The majority of aggregate was consumed within the province, with approximately 2 million tonnes exported.

Two companies eclipsed the 1 million tonne mark for crushed stone production in 1998. Rocky Lake Quarry Limited of Bedford, Nova Scotia, reported shipments of 1.4 million tonnes while Martin Marietta Materials Canada Ltd. reported just over 2.0 million tonnes shipped. Martin Marietta's Porcupine Mountain operation was the country's seventh largest in 1998.


About the Mineral Resources Branch



Publications, Maps and Digital Data



Geology, Minerals and Mining Topics



Upcoming Events

 

Blue Line

Back to Top

Previous Top Nova Scotia Government Home Page Index of Nova Scotia Government Web Sites Search Nova Scotia Government Web Site Next
The contents of this site are best viewed with an enhanced browser such as
Microsoft® Internet Explorer® or Netscape® Navigator®.

Comments and questions about this web site.
This page and all contents are copyright 2001-present
Mineral Resources Branch,
Department of Natural Resources,
Province of Nova Scotia,
all rights reserved.
Page last updated August 5, 2008.

Privacy Policy: http://www.gov.ns.ca/govt/privacy/default.asp